Skip to main content
UK Road Signs

Temporary sign

3-way signal control sign

3-way signal control sign: a red rectangle with 3-way control and the words Wait here until green light shows
Sign image: Department for Transport, © Crown copyright

What does the 3-way signal control sign mean?

Temporary signals control a junction at road works. Wait at the sign until the green light shows.

Also known as: Temporary junction signals, 4-way signal control

What it means

Temporary signals control this junction. Wait here until the green light shows.

Temporary signals may be used to control a road junction at road works. The sign says how many ways are controlled.

The red signal is likely to stay on longer than for normal shuttle working, as traffic on each leg of the junction passes through separately.

Where you'll see it

At road works where temporary signals control a junction.

Rules to know

  • Temporary signals control a junction. '3-way' may be varied to '4-way'.

    Know Your Traffic Signs, p. 159

  • Where temporary signals control a junction, the red signal is likely to stay on longer than for normal shuttle working.

    Know Your Traffic Signs, p. 159

Read more

Common mistakes

  • Mistake: Going on red because the road looks clear.

    Instead: Wait until the green light shows.

Test yourself

Recalling the answer helps it stick. Pick an answer to see how you did.

Question 1 of 1

What does this sign mean?

Red rectangular sign with a small panel above a larger panel of white capital letters

Ready for more? Take the Temporary Signs Quiz

Download this sign

© Crown copyright. Free to reuse under the Open Government Licence v3.0, as long as the sign is reproduced accurately and not in a misleading context.

More temporary signs

All temporary signs

Share this sign

Pinterest (opens in a new tab)Facebook (opens in a new tab)X (opens in a new tab)WhatsApp (opens in a new tab)Email

Sources

Sign image: Department for Transport, Traffic sign images (diagram 7011.1). © Crown copyright, reused under the Open Government Licence v3.0.

Last reviewed 11 October 2026. This page explains the sign in our own words; for the full rules, see The Highway Code. How we source and check content